Where to Begin

Dale’s work on our mountain home—where to start—on a place that sat untouched for seven years? Seven seasons of uncontrolled plant growth, seven years of hurricane winds that stripped paint and battered siding, seven years of rodents and spiders who made a home in our home, seven seasons of neglect inside and out made for an extensive list.

Dale first tackled the inside painting. This, and the removal of the red, paisley flocked wallpaper a la 1960s, kept him busy while I prepped our Indian Springs home.  A golden knotty pine framed doors and windows of the entire house and our choice of “Open Arms”—a soft, mellow yellow, almost a butter color, blended deliciously. I was relieved when I received the picture, after the fact, of the finished vaulted ceiling and Dale in complete climbing gear, minus the helmet which he claimed he removed to take the picture.

Dale in climbing gear

Before we could enjoy this house, the basics, e.g. solar panels for electricity required priming. While workers installed a new inverter, Dale focused on the inside of the house. The showers and tubs drained slowly or not at all, so plumbers labored on that—basically, calcium and other mineral deposits clogged the house after years of disuse. A “water softener” guy worked on the water softener. A “propane” guy restored and refueled the gas tank. Our purchase of the deluxe home warranty paid off with the dishwasher and oven, two of the many appliances that hadn’t been tested or used in years, and needed fixing.

Finally, November can be an Indian summer of scorching temperatures and raging wildfires, or as happened last year, an El Nino of rains and floods. A flood, not one or two, more like five floods, soaked the boxes that survived the trek from Indian Springs to our mountain home. Between stripping, nailing, painting, and caulking, Dale “squeegeed” the garage of the torrents of water that flowed down our practically precipitous driveway, and just one more problem we faced.